First-article approval
First-article parts go to the customer for sign-off before the line is scheduled.
Inspection is part of the process, not a check at the end. The first article is approved before the run is released, and the production record stays on file with us.
First-article parts go to the customer for sign-off before the line is scheduled.
Critical dimensions are measured through the run; typical part tolerance is ±0.05 mm.
Material, tool, machine and production date are recorded against every batch shipped.
Runners and rejects are ground in house and fed back into the production cycle.
We work as a subcontractor and contract manufacturer — from single parts to scheduled series deliveries against a blanket order.
Bottles, jerrycans, closures and transport packaging for fillers and distributors.
Technical parts resistant to water, pressure and common cleaning agents.
Housings, brackets and insulating parts built to the customer's drawing.
Junction boxes, covers, profiles and small hardware for the site.
Containers, crates and equipment parts for primary production and processing.
Engraving, branding and packing of finished products for retail.